shovel dumper combination ppt

  • Category:grinding mill for making powder
  • Applications: : 28 Shovel dumper miningppt Optimization of Shovel View 28 Shovel dumper miningppt from MINING ENG MN331 at NIT Rourkela Optimization of Shovel dumper combinati

shovel dumper combination ppt

  • 28 Shovel dumper miningppt Optimization of Shovel

    View 28 Shovel dumper miningppt from MINING ENG MN331 at NIT Rourkela Optimization of Shovel dumper combination Open pit mining • shovel, dumpers represent major capital and operating costs •23/05/2020· Cost Benefit Analysis 1 Capital Cost Shovel Dumper Combination Shovel Cost = 7 * 8 crore = 56 crore ₹ Dumper Cost = 34* 3 crore = 102 crore ₹ Total Cost = 158 crore ₹ Integrated loader dumper Total ILD Cost = 21* 65 crore = 1365 crore ₹ BENEFIT : 215 CRORE ₹ 13 14 Cost Benefit Analysis 3 Fuel Consumption Shovel DumperUse of Integrated loader dumper over Shovel dumper

  • Analysing shovel dumper productivity for coal mine

    30/12/2019· Dumpers Shifts Availability% Mechanical 3 67 2 87 Electro wheel drive 3 72 2 89 12 Calculation for productivity of shovel and dumper SL No Particulars 10 cum Electric rope shove+120 ton Dumper 1 Dumper payand dumpers both and helps to achieve maximum utilization of shoveldumper combination system working in the mine 24 Enterprise Resource Planning Today, existing opencast mining operations have little realtime visibility into their production and maintenance information For large mines better access to consistent information can be achievedshovel dumper combination ppt zygomatfr

  • shovel dumper combination in ppt misnieruchomoscipl

    (extraction coal by surface miner) (by shoveldumper OB removal (by shoveldumper combination) The Project report was approved by Board of Directors of SECL in their 156th meeting on 29062006 with a capital investment of Rs 2230 Crores 11 SALIENT FEATURES OF THE SANCTIONED PROJECT The salient features of the sanctioned project (Approvedmining with shovel dumper combination shovel and dumper combination in coal mine 01072018· It is a 42m3 electric rope shovel with combination of the 240 tonn CAT dumper filling and loading overburdenmining with shovel dumper combination

  • Differnt technologies in oc mines SlideShare

    13/03/2012· Mining with SHOVEL – DUMPER combination ISN 44 45 1)Shovel Dumper technology • This is the most commonly used technology in Opencast mines • Basically two variants – Rope shovels and Hydraulicppt on opencast coal mining Mar 01, 2022Coal mining is carried out by Surface or opencast' mining Room and Pillar Mining 2007 Detailed data compilations, Powerpoint presentations, Chat now Learn More opencast coal mining by shovel dumper and dragline ppt Working of dragline SlideShare opencast coal mining by shovel dumper and dragline ppt Surface orOpencast Coal Mining بواسطة Shovel Dumper And Dragline Ppt

  • Transport & digging capacity calculation SlideShare

    16/09/2013· 7 Calculation of Annual Digging Capacity of 765m3 Shovel No Description Value 1 bucket size m3 765 2 fill factor for well blasted rock = 80% 080 3 average bucket capacity = 765 x 080 m3 612 4 swing time second21/11/2014· The paper deals with the productivity analysis of different shoveltruck combination conducted for two open pit coal mines and then will compare their productivities Average Loading and TruckDETERMINATION OF SHOVEL TRUCK PRODUCTIVITIES

  • shovel dumper combination

    Shovel dumper combination: • This is the most commonly SELECTION , Typical open cast mine SELECTION CRETERIA FOR OC EQPT More details » Get Price optimization of different loads on a dump truck in an open cast mine , The present openpit mining conditions in India, calls for ShovelDumper combinations in most cas The dumper ,shovel dumper combination in opencast mine , DRAG line used in opencast coal mining with dumper shovel , Shovel and Dumper Combination Draglindynamic models for open cast coal mining pdf Energy Performance of Dump Trucks in Opencast Minepdf , a surface pit left over from a dragline coal mining , sbigospk Open cast mining and coalopencast coal mining by shovel dumper and dragline ppt

  • mining with shovel dumper combination

    mining with shovel dumper combination shovel and dumper combination in coal mine 01072018· It is a 42m3 electric rope shovel with combination of the 240 tonn CAT dumper filling and loading overburden30/09/2020· This newsletter affords a new analytic calculation for the shovel–dumper combination in open cast limestone mine evolution of theOptimization of ShovelDumper Combination in an Open

  • shovel dumper combination operaparciparlach

    28/05/2022· Ausa Dumper Parts UK Construction Parts Ausa produce an excellent range of rigid chassis and articulated dumpers ranging from 850 to 10,000 kg payload There are 4WD, 2WD, mechanical, hydrostatic and torque converter transmissions available in combination with front, height and swivel unloading hoppers Ausa also produce a selfloading shovel dumperppt on opencast coal mining Mar 01, 2022Coal mining is carried out by Surface or opencast' mining Room and Pillar Mining 2007 Detailed data compilations, Powerpoint presentations, Chat now Learn More opencast coal mining by shovel dumper and dragline ppt Working of dragline SlideShare opencast coal mining by shovel dumper and dragline ppt Surface orOpencast Coal Mining بواسطة Shovel Dumper And Dragline Ppt

  • Transport & digging capacity calculation SlideShare

    16/09/2013· 7 Calculation of Annual Digging Capacity of 765m3 Shovel No Description Value 1 bucket size m3 765 2 fill factor for well blasted rock = 80% 080 3 average bucket capacity = 765 x 080 m3 612 4 swing time second 28 5 passes per minute, continuous operation 60/28 214 6 cubic metre per hour continuous 612 x 60/28 x 60 787 7 swellShovelDumper Combination ; Surface Miner ; InPit Crushing Conveying; 3 Present Technology Level Underground Mines ; Board Pillar Method ; Drill Blast Intermediate technologies with SDLs and LHDs Blasting Gallery Technology ; Continuous Miner Technology ; Long wall / Shortwall Technology ; High wall Technology; 4 Coal Production (1314) UG OC Perspective of CIL PowerPoint PPT Presentation

  • EXECUTIVE SUMMARY

    Method of Mining: Opencast with Shovel Dumper Combination Climate is generally dry to moist tropical with Temp (60 C min to 480C max) Machinery for OB Removal Combination of 42 & 10 Cum Electrical Rope Shovel & 240 T & 100 T Dumpers Machinery for Coal Winning: Surface Miner with combination of 10 Cum of FEL with 60 T truck Coal Handling: It is proposed too Using a combination of above (integrated mining systems) wwwtechopen Mining Methods 4 x Highwall mining x Continuous highwall mining, and x Auger mining This chapter will only focus on surface mining operations in the Australian coal industry Fig 1 Australian coal resource map (Geoscience Australia, 2009) Fig 2 Electricity generation by fuel (ABARE,Surface Coal Mining Methods in Australia IntechOpen

  • Opencast Coal Mining By Shovel Dumper And Dragline Ppt

    “Modeling of shovel dumper combination system in opencast mines,by draglines or by shovel and,was collected from Bharatpur opencast coal mine, Contact Mining Methods SlideShare Dec 05, 2008Shovel + Dumper 2 Dragline 3 Surface Miner 4 Bucket Wheel Excavator 5 Inpit crushing + Spreader 14 Schematic diagram of Opencast 15 Heavy blasting in open cast(extraction coal by surface miner) (by shoveldumper OB removal (by shoveldumper combination) The Project report was approved by Board of Directors of SECL in their 156th meeting on 29062006 with a capital investment of Rs 2230 Crores 11 SALIENT FEATURES OF THE SANCTIONED PROJECT The salient features of the sanctioned project (Approvedshovel dumper combination in ppt misnieruchomoscipl

  • mining with shovel dumper combination zygomatfr

    productivity of mining shovels dumpers shovel dumper combination in,Crusher News shovel dumper combination in opencast mineThe Mining Machine is custom designed to reduce your operating costs mining with shovel dumper combination tislin operating cost of dumper and shovel Vietnam Kk Surface Miner, Slideshare 26 Jul 2009 Mining with shovel Rio Tinto02/10/2020· Keywords: Optimization, ShovelDumper Combination, Open Cast, Simulation Software, TALPAC I INTRODUCTION Most of the world’s solid minerals are mined in openpit minesOptimization of ShovelDumper Combination in an Open Cast

  • Quartz Crusher Case Shovel Dumper Combination In Opencast

    opencast coal mining by shovel dumper and dragline ppt liCGMne quarry, with shovel dumper combination Grinding helping professionals like Binod Gupta Method of mining was opencast with shovel, We Have More Than 40 Years of ExperienceAbout shovel and dumper combination okdgroup About shovel and dumper combination Products As a leading global manufacturer of crushing, grinding and mining equipments, we offer advanced, reasonable solutions for any sizereduction requirements including, About shovel and dumper combination, quarry, aggregate, and different kinds ofmining with shovel dumper combination creativefrequency

  • shovel dumper combination in opencast mine

    Method of Mining: Opencast with Shovel Dumper Combination Climate is generally dry to moist tropical with Temp (60 C min to 480C max) Machinery for OB Removal Combination of 42 & 10 Cum Electrical Rope Shovel & 240 T & 100 T Dumpers Machinery for Coal Winning: Surface Miner with combination of 10 Cum of FEL with 60 T truck Learn More BARORA AREA –How much do coal mines in India contribute to global warming , Know More 4 Aug 2016 , Although it is a bit difficult to quantify the global warming contribution of 200 open , A standard open cast mines in India operates on ShovelDumper combination A shovel loads coal or overburden on a dumper, which then , The opencast mines, they contribute enough ofshovel dumper combination in opencast mine multiboxpl

  • Dumper Cycle Study SlideShare

    31/07/2016· 12 For DCMP Dump Average total waiting time: 735 minutes Average positioning time: 1 minute Average loading time: 35 minutes Travel time (loaded): 964 minutes Travel time (empty): 885 minutes 13 For DCMP Dump Average weighing time: 1 minute Average unloading time: 078 minute Average observed cycle time: 3242 minutes 14ShovelDumper Combination ; Surface Miner ; InPit Crushing Conveying; 3 Present Technology Level Underground Mines ; Board Pillar Method ; Drill Blast Intermediate technologies with SDLs and LHDs Blasting Gallery Technology ; Continuous Miner Technology ; Long wall / Shortwall Technology ; High wall Technology; 4 Coal Production (1314) UG OC Perspective of CIL PowerPoint PPT Presentation